Moving to Hosted SAT>IP: A 10-Step Headend Cutover Plan

Quick answer: Move from an on-site satellite headend to hosted SAT>IP by keeping the existing input live while you test the hosted input in parallel. Match service IDs and components, validate delivered bitrate, continuity and end-to-end playback, then switch a small group first. Keep the old path ready until the new one passes agreed stability and failover checks.

1. Mark what moves and what stays

Hosted reception can replace the RF ingest while leaving your transcoder, middleware, channel numbers and distribution untouched. Draw the old and new paths and mark the responsibility boundary. Moving all downstream components at the same time makes fault isolation and rollback harder.

2. Export the working lineup and configuration

Create a manifest with orbital position, carrier parameters, source inputs, service IDs, audio and subtitle choices, scrambling requirements and downstream channel or multicast mappings. Export your configs and verify you can restore them. Store secrets separately from the change document.

3. Verify reception at the new site

Use the exact beam, carrier, ISI and PLS where applicable, and ask for a real sample of the required service. Check whether your priority feeds need T2-MI extraction or authorized CA handling before switching. Use the provider checklist to agree what constitutes a successful handoff.

4. Provision receivers and network for overlap

Size simultaneous locks from the tuner plan and budget network capacity for both copies wherever the two paths share a link. Allowlist only the required sources and verify that the receiving application supports the agreed mode; SAT>IP over TCP-interleaved and a direct HTTP TS input are different handoffs.

5. Bring the new inputs up away from production

Add hosted inputs as inactive alternatives or on a test instance. Do not let test multicast outputs collide with production addresses and ports. Use a separate test playlist or receiver, and check that the new input does not accidentally retune or displace an active session.

6. Compare the transport and the actual output

Compare stream bitrate and gaps at your ingest point, transport sync, continuity counts, PAT/PMT entries, timing and required components. Compare against the old path’s baseline, not a raw zero-counter assumption. Check audio and video on real clients and verify that monitoring fires on a known interruption. See the TSDuck cookbook for capture and analysis.

7. Verify transformations and authorized access

For T2-MI on SATLINE Streamer Pro, confirm t2mi_pid identifies the PID carrying T2-MI in the outer satellite transport stream, t2mi_plp selects the desired pipe, and t2mi_pids selects components in the recovered inner TS. Test that output as delivered; do not add a second decapsulation stage to an already decapsulated feed. Confirm separately where any authorized descrambling belongs.

8. Set and rehearse the go/no-go rules

Agree on maximum interruption, a delivered bitrate or gap threshold appropriate to each stream, and what constitutes a material new TS or playback error. Assign a cutover lead, a rollback owner and an incident channel. Switch back once in staging so the team knows what recovery looks like.

9. Switch a small production group first

Select a small group with known owners and a test receiver. Change only its source, keep output mappings stable, and watch the hosted input and downstream player together. If it passes, move the remaining groups in batches. Stop at the first failed gate rather than continuing the schedule.

10. Keep the old path until the handover is accepted

Keep local reception ready for the agreed soak period and keep a verified copy of its configuration. Confirm how to return to the primary path after a failure, who gets the alerts and who owns the system. Retire the old path only after sign-off; leave it in place for longer if it is your independent backup.

Worked example: move 24 services in three batches

Illustrative runbook. Test all 24 hosted services for 24 hours off production, then cut over three batches of eight. Define continuity and gap tolerances from the working baseline and agree them before the maintenance window.

Example go/no-go gates and actions
GateGo whenIf it fails
Parallel trial24/24 services present with required audio and subtitles; agreed per-service checks passKeep the original production path; investigate the new input
First batchEight services play end to end; no material new transport errors or delivery gaps in an agreed 30-minute observation windowReturn the eight to the old input; verify playback; pause later batches
Remaining batchesEach batch clears the same checks; monitoring and operator sign-off are in placeRestore the affected batch and hold the next one
After 48-hour soakRepresentative load passes, and the drill verifies both switching to backup and returning to primaryKeep the old chain ready and extend the observation period

Rollback means restoring the old input and confirming playback. An enabled input or a green lock icon is not proof that service was restored.

Before reserving the maintenance window, use the bandwidth worksheet for the overlap and backup paths. A normal-day link that runs near capacity may fail during dual running.

Frequently asked questions

Can I keep my current middleware and channel numbers?

Yes, if you move only the ingest source and retain the downstream service mapping. Check actual service IDs and track selections before assuming the old mapping still points to the right content.

Do I need to convert SAT>IP into HLS to migrate?

No. Hosted SAT>IP is an ingest handoff. Keep the delivery stack you already use if it accepts the tested output, or add a conversion at the boundary you actually need.

What if the new receiver is locked but the channels stop?

Check delivered TS bitrate and time gaps first. Then compare sync, continuity, signalling and decoded output against the known-good path. RF lock alone does not show whether the IP stream is usable.

Technical references and tools

About the author

Gleb Sazanov

Project Leader

Gleb Sazanov is an accomplished Chief Technology Officer (CTO) with over 20 years of experience in software development, system architecture, and cloud-based solutions. As the CTO of SATLINE, a leading provider of virtual and colocation services tailored to SATCOM businesses, Gleb drives the company’s technological strategy, fostering innovation and efficiency in data center services. His expertise spans various domains, including DevOps, system scaling, and high-performance infrastructure management. With a deep passion for cutting-edge technologies, Gleb plays a pivotal role in shaping the future of the SATCOM industry.